Refer to exhibit 504029 from a customer's Aruba CX6200 switch:
Which statement is true in this scenario?
Answer : B
Your customer requires a data protection solution that will support their workloads running on an HPE Alletra MP B10000 storage array.
Your customer requirements include:
- Protecting VMware vSphere workloads
- Conversion between hypervisors
- Pay-per-use model
- Near synchronous and block-level replication
Select the most appropriate solution.
Answer : D
Your customer has requested a solution with HPE Alletra Storage MP B10000 that needs to have eight 32GB FC ports per node for direct host connectivity.
A junior architect has prepared a BOM for the solution.
Refer to BOM:
What needs to be changed in the BOM to meet the requirement?
Answer : C
Your customer is expecting to see an increase in the amount of data stored on their HPE Alletra Storage MP B10120.
You are asked to create a plan to support a raw capacity of 620 TB on the unit.
Refer to exhibit:
What change would you recommend to the configuration to achieve this?
Answer : C
Your customer is looking for a hardware platform to deploy a SAP HANA workload. They are considering HPE Superdome Flex, HPE Synergy and HPE ProLiant systems.
Which statement about these hardware platforms is true for a SAP HANA solution?
Answer : C
Your customer plans to replace a legacy HPE BladeSystem solution with HPE Synergy platform.
The customer requirements include:
- 30 compute nodes to support their virtualization workload
- Redundancy within the management subsystem
- An in-frame storage solution to support vSAN
- A redundant networking subsystem with the ability to virtualize WWNs
- Simplified management with a single logical enclosure
You are reviewing the following proposal:
- 3 x HPE Synergy 12000 frames
- 2 x HPE Virtual Connect SE 100 Gb F32 Modules for Synergy
- 4 x HPE Synergy 50 Gb Interconnect Link Modules
- 3 x HPE D3940 Storage Module with the maximum number of drives
- 6 x HPE Composed - 30 x HPE OneView Advanced licenses
- 30 x SY 480 Gen11 compute modules, each with two CPUs and all required mezzanine cards
Which statement about this proposal is true to help meet the customer requirements?
Answer : D
Your customer needs to increase the availability of their storage infrastructure built on top of their HPE Alletra MP B10000 storage systems. You need to design Active Peer Persistence for HPE Alletra MP B10000 Remote Copy configuration.
Which of the following statements is true? (Choose two.)
Answer : AC
Your customer is using an HPE SimpliVity 380 Gen11 environment that is only managed with on-prem utilities.
How can this solution be integrated into the HPE GreenLake management platform to benefit from the HPE Private Cloud Business Edition features?
Answer : D
Your customer has provided the CLI output of a switch to show how their devices are connected.
Refer to the output:
What should you consider while designing upgrades to your customer's environment and network components?
Answer : D
Your customer is planning a Scality Ring solution. Approximately 750 TB of data must be stored on the SDS. The customer prefers SSD or NVMe drives.
What is true regarding this solution?
Answer : C
A customer is about to do a server refresh with the intent of using HPE ProLiant DL360 Gen11 servers, with CPUs exceeding 270 watt power usage. The customer has existing 19", 42U, air cooled racks they are planning to reuse.
Which cooling option will allow your customer to use the servers with their existing racks, with the least amount of changes to the setup?
Answer : D
One of your customers is planning to refresh their current campus' wired and wireless networking equipment. They are currently moving to a pay-per-use model for their whole IT solution.
They are wondering if there is a possibility to get new networking equipment in this model without capital expenses. They are also interested in moving LAN management to an external service provider. You are presenting HPE GreenLake for Aruba Networking.
What is true regarding this scenario?
Answer : A
Your customer would like to increase the availability of their storage infrastructure, built on top of their HPE Alletra Storage MP B10000 storage systems. They would like you to design Active Peer Persistence for HPE Alletra Storage MP B10000 Remote Copy configuration.
Which statement is true?
Answer : D
Your customer is planning to use HPE VM Essentials as an alternative hypervisor, using HPE ProLiant DL380 Gen11 servers and HPE Alletra Storage MP B10000 over iSCSI.
What consideration must be made for cluster creation?
Answer : D
Your customer plans to deploy multiple virtual machines running database workloads. They plan to re-use and extend an existing Synergy, 3PAR, and VMware infrastructure.
What is true regarding a possible upgrade?
Answer : A