Which process does NVIDIA NIM accelerate?
Answer : A
Refer to the exhibit.
Which statement about this logical interconnect group is true?
Answer : C
HOTSPOT -
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Answer :
DRAG DROP -
Match each HPE Synergy logical component with the definition.
Answer :
You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support.
Which interconnections are required to support this connection? (Choose two.)
Answer : AF
Your customer plans to add four HPE Synergy frames to an existing management ring. All installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.
Which statement about mixing different FLM modules is true?
Answer : D
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames.
How will this change impact the customer environment?
Answer : A
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster.
You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard license for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options
Which statement about this proposal is true?
Answer : B
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules, HPE ProLiant Gen10 servers and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?
Answer : A
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed. They plan to deploy a second nPar and HPE Superdome Flex 280. They play to manage new components using HPE OneView.
What must be done to achieve this goal?
Answer : B
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives.
The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE D3940 Storage Module with 40 SSDs – All required cables and options
Which statement about this request is true?
Answer : A
A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?
Answer : C
Your customer has the following HPE Synergy setup:
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 Gb Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?
Answer : D
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis.
Which components must be included in the proposal to meet the customer’s needs?
Answer : C
Your customer has the following HPE Synergy setup:
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb Interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules
The customer needs to add a frame.
Which statement about the expansion of this setup is true?
Answer : C