Dell PowerScale Maintenance v1.0

Page:    1 / 4   
Exam contains 48 questions

A Dell PowerScale H400 node has one SSD installed. The SSD has failed and must be replaced.
Where must the new drive be installed?

  • A. Position 0 on sled A
  • B. Right slot at the back of the node
  • C. Left slot at the back of the node
  • D. Position 4 on sled A


Answer : C

Following Dell best practices, which external network ports should be used on PowerScale A300 or A3000 nodes?

  • A. 1/25 GbE or 20/40 GbE
  • B. 10/40 GbE or 1/100 GbE
  • C. 10/25 GbE or 40/100 GbE
  • D. 1/100 GbE or 10/25 GbE


Answer : C

A platform engineer is replacing a failed Dell PowerScale Gen6 node at a customer site. They remove all cables from the compute module and observe that some of the LEDs inside the node are lit.
What action must the platform engineer take?

  • A. Contact technical support.
  • B. Wait until the node is shut down.
  • C. Shut down the partner node before proceeding.
  • D. Continue on to the next step.


Answer : B

A customer wants to add SSDs to the drive sleds in a Dell PowerScale H600 node for expanded caching.
What should the platform engineer tell the customer?

  • A. Caching SSDs are placed in dedicated slots in the compute module.
  • B. Each node sled must have an equal number of caching SSDs.
  • C. Only F200, F600, F810 nodes can use SSDs.
  • D. Cache expansion requires a Dell Professional Services engagement.


Answer : B

An engineer runs the isi status command.
What are they trying to accomplish?

  • A. Obtain the health of the cluster.
  • B. Show cluster CPU performance.
  • C. Show cluster network performance
  • D. Obtain the health of the drives in the cluster.


Answer : A

What is the main purpose of the vault operation in PowerScale F200, F600 and F900?

  • A. Erasure of data from NVDIMM flash during the restore process.
  • B. Transfers data from DRAM to NVDIMM flash and conversely during BIOS startup
  • C. Handles storing data in NVDIMM flash from DRAM


Answer : B

A customer wants to create a cluster mixing F600 and A300 nodes.
What is the minimum number of each node type that they need to build the cluster?

  • A. 4x F600
    4x A300
  • B. 4x F600
    3x A300
  • C. 3x F600
    4x A300
  • D. 2x F600
    2x A300


Answer : C

What must be verified during the installation of a fully populated Titan-HD rack with H7000 nodes?

  • A. There are at least four people available to lift each node.
  • B. Proper DC power is being supplied to the rack.
  • C. The correct number of hard drives have been shipped.
  • D. The data center floor is rated to support 1588 kg (3,500 lb).


Answer : D

What is recommended when connecting the power cables to a new 4U chassis?

  • A. Connect members of a node pair to different power sources.
  • B. Connect individual chassis to alternating power sources.
  • C. Connect each node in a chassis to one of four different PDUs.
  • D. Connect one node pair to one power source and the other node pair to a different power source.


Answer : A

What is the purpose of SolVe Desktop?

  • A. Provide customers with instructions for diagnosing hardware, replacing CRU and FRU hardware items, and updating the cluster after replacing parts.
  • B. Provide a laptop connection to gather logs, perform pre-upgrade checks, install firmware and patches, and import data back to Dell support for analysis.
  • C. Provide centralized access to step-by-step procedures while offline or in high-security locations.
  • D. Provide access to the latest OneFS codes and firmware packages to download during hardware installation.


Answer : C

Which port is used for the WebUI on a Dell PowerScale cluster?

  • A. 9443
  • B. 22
  • C. 8080
  • D. 8443


Answer : C

What is recommended when replacing the M.2 card in a PowerScale Gen6 system?

  • A. Ignore the battery pack and cable.
  • B. Keep the battery caddy connected.
  • C. Remove the battery pack and disconnect the cable.
  • D. Leave the HBA riser in place.


Answer : C

What is the isi devices node smartfail command used for?

  • A. Failover a node
  • B. Remove a node
  • C. Add a node
  • D. Failback a node.


Answer : B

A platform engineer is adding a node to a Dell PowerScale cluster. The node is powered on and cabled.
What option is displayed once the serial connection to the node is established?

  • A. Reformat the node
  • B. Upgrade node firmware
  • C. Create a new cluster
  • D. Configure the network


Answer : C

Dell Technical Support has required a part be sent back to Dell Logistics to be studied.
Which process or document must be completed before sending the part back?

  • A. CDMR
  • B. WWFA
  • C. DMR
  • D. DTFA


Answer : C

Page:    1 / 4   
Exam contains 48 questions

Talk to us!


Have any questions or issues ? Please dont hesitate to contact us

Certlibrary.com is owned by MBS Tech Limited: Room 1905 Nam Wo Hong Building, 148 Wing Lok Street, Sheung Wan, Hong Kong. Company registration number: 2310926
Certlibrary doesn't offer Real Microsoft Exam Questions. Certlibrary Materials do not contain actual questions and answers from Cisco's Certification Exams.
CFA Institute does not endorse, promote or warrant the accuracy or quality of Certlibrary. CFA® and Chartered Financial Analyst® are registered trademarks owned by CFA Institute.
Terms & Conditions | Privacy Policy | Amazon Exams | Cisco Exams | CompTIA Exams | Databricks Exams | Fortinet Exams | Google Exams | Microsoft Exams | VMware Exams